Task
- Restructuring of production
- Implementation of a cross-divisional efficiency programme to optimise productivity and adherence to schedules
- Introduction of clocked flow production with just-in-sequence material supply
Industry/ Function / Environment / Expert
- Railway industry
- Production Manager
- Restructuring
- Organisational adjustment through centralisation of production planning and control with direct reporting to the Production Manager
- Process analysis in all production areas and implementation of an efficiency programme to optimise productivity
- Introduction of a key performance indicator (KPI) system in all production areas for adherence to schedules and throughput times
- Introduction of shop floor management in all production areas
- Initiation and organisation of internal professional development in the electrical assembly area
- Involvement of an interim logistics expert to improve the missing parts situation
- Increasing the efficiency of all production processes
- Increase in productivity
- Reduction of throughput times
- European market leader in the development, production and service of diesel locomotives
- 500 employees at two locations in Germany